Go to www.forthecommondefense.org/reports to view detailed reports on Connecticut counties, cities, Congressional Districts, industries, small businesses and information on sources and methodology.
BACKGROUND ON THE DEFENSE BUDGET CUTS: 2013-2021
|
State | City | Contract Year | Product or Service | $ Amount | Reduction by 9.0% | Reduction by 18.0% |
Connecticut | Thomaston | 2012 | Antennas, Waveguides & Related Equipment | $20,810 | -$1,873 | -$3,746 |
Connecticut | Thomaston | 2012 | Bearings, Antifriction, Unmounted | $21,709 | -$1,954 | -$3,908 |
Connecticut | Thomaston | 2012 | Bearings, Mounted | $22,149 | -$1,993 | -$3,987 |
Connecticut | Thomaston | 2012 | Bearings, Plain, Unmounted | $17,993 | -$1,619 | -$3,239 |
Connecticut | Thomaston | 2012 | Cable, Cord, Wire Assemblies: Comm Equip | $124,504 | -$11,205 | -$22,411 |
Connecticut | Thomaston | 2012 | Centrifugals, Separators, And Press and Vac Filt | $54,109 | -$4,870 | -$9,740 |
Connecticut | Thomaston | 2012 | Chemical Analysis Instruments | $15,694 | -$1,412 | -$2,825 |
Connecticut | Thomaston | 2012 | Circuit Breakers | $36,318 | -$3,269 | -$6,537 |
Connecticut | Thomaston | 2012 | Coil, Flat, And Wire Springs | $5,292 | -$476 | -$953 |
Connecticut | Thomaston | 2012 | Coils and Transformers | $40,945 | -$3,685 | -$7,370 |
Connecticut | Thomaston | 2012 | Combination & Miscellaneous Instruments | $72,846 | -$6,556 | -$13,112 |
Connecticut | Thomaston | 2012 | Converters, Electrical, Nonrotating | $883,511 | -$79,516 | -$159,032 |
Connecticut | Thomaston | 2012 | Converters, Electrical, Rotating | $160,000 | -$14,400 | -$28,800 |
Connecticut | Thomaston | 2012 | Custodial - Janitorial Services | $7,287 | -$656 | -$1,312 |
Connecticut | Thomaston | 2012 | Driers, Dehydrators, And Anhydrators | $22,020 | -$1,982 | -$3,964 |
Connecticut | Thomaston | 2012 | Electrical & Elct Boards, Cards & Asscted Hrdwre | $836,324 | -$75,269 | -$150,538 |
Connecticut | Thomaston | 2012 | Electrical Contact Brushes & Electrodes | $295,603 | -$26,604 | -$53,209 |
Connecticut | Thomaston | 2012 | Electrical Control Equipment | $1,446,580 | -$130,192 | -$260,384 |
Connecticut | Thomaston | 2012 | Engineering Technical Services | $455,060 | -$40,955 | -$81,911 |
Connecticut | Thomaston | 2012 | Fastening Devices | $70,301 | -$6,327 | -$12,654 |
Connecticut | Thomaston | 2012 | Fittings and Specialties; Hose, Pipe, Tube | $83,003 | -$7,470 | -$14,941 |
Connecticut | Thomaston | 2012 | Fuel Oils | $21,957 | -$1,976 | -$3,952 |
Connecticut | Thomaston | 2012 | Fuses, Arrestors, Absorbers, & Protectors | $24,928 | -$2,244 | -$4,487 |
Connecticut | Thomaston | 2012 | Gas Generating and Dispensing Systems | $7,721,683 | -$694,951 | -$1,389,903 |
Connecticut | Thomaston | 2012 | Generators and Generator Sets, Electrical | $175,529 | -$15,798 | -$31,595 |
Connecticut | Thomaston | 2012 | Hardware, Weapon System | $49,684 | -$4,472 | -$8,943 |
Connecticut | Thomaston | 2012 | Hazard-Detecting Instruments & Apparatus | $232,070 | -$20,886 | -$41,773 |
Connecticut | Thomaston | 2012 | Hose and Tubing, Flexible | $4,565 | -$411 | -$822 |
Connecticut | Thomaston | 2012 | Installation of Eq/Alarm & Signal Systems | $4,495 | -$405 | -$809 |
Connecticut | Thomaston | 2012 | Landscaping/Groundskeeping Services | $246,578 | -$22,192 | -$44,384 |
Connecticut | Thomaston | 2012 | Lease or Rental of Eq/Electrical & Elct Eq Comps | $1,750 | -$158 | -$315 |
Connecticut | Thomaston | 2012 | Lease or Rental of Eq/Miscellaneous Equipment | $11,450 | -$1,031 | -$2,061 |
Connecticut | Thomaston | 2012 | Liq & Gas Flow, Liq LVL, & Mech Motion Meas Instru | $69,366 | -$6,243 | -$12,486 |
Connecticut | Thomaston | 2012 | Maint & Repair of Eq/Miscellaneous Equipment | $246,019 | -$22,142 | -$44,283 |
Connecticut | Thomaston | 2012 | Maint & Repair of Eq/Ship & Marine Equipment | $1,587 | -$143 | -$286 |
Connecticut | Thomaston | 2012 | Maint/Dams | $10,947 | -$985 | -$1,970 |
Connecticut | Thomaston | 2012 | Maintenance of EPG Facilities - Gas | $8,323 | -$749 | -$1,498 |
Connecticut | Thomaston | 2012 | Maintenance of Other Administrative Facilities and Service Buildings | $4,027 | -$362 | -$725 |
Connecticut | Thomaston | 2012 | Mineral Construction Materials, Bulk | $10,404 | -$936 | -$1,873 |
Connecticut | Thomaston | 2012 | Mining, Rock Drilling, Earth Boring Equip, Related | $91,314 | -$8,218 | -$16,437 |
Connecticut | Thomaston | 2012 | Misc Electric Power & Distribution Eq | $153,732 | -$13,836 | -$27,672 |
Connecticut | Thomaston | 2012 | Misc Electrical & Electronic Components | $55,011 | -$4,951 | -$9,902 |
Connecticut | Thomaston | 2012 | Miscellaneous Construction Equipment | $20,140 | -$1,813 | -$3,625 |
Connecticut | Thomaston | 2012 | Miscellaneous Construction Materials | $6,024 | -$542 | -$1,084 |
Connecticut | Thomaston | 2012 | Miscellaneous Hardware | $3,652 | -$329 | -$657 |
Connecticut | Thomaston | 2012 | Miscellaneous Power Transmission Equip | $59,525 | -$5,357 | -$10,715 |
Connecticut | Thomaston | 2012 | Miscellaneous Ship and Marine Equipment | $6,548,817 | -$589,394 | -$1,178,787 |
Connecticut | Thomaston | 2012 | Motors, Electrical | $2,057,209 | -$185,149 | -$370,298 |
Connecticut | Thomaston | 2012 | Nuts and Washers | $500 | -$45 | -$90 |
Connecticut | Thomaston | 2012 | O-Ring | $9,103 | -$819 | -$1,639 |
Connecticut | Thomaston | 2012 | Other Buildings | $3,665 | -$330 | -$660 |
Connecticut | Thomaston | 2012 | Packing and Gasket Materials | $29,808 | -$2,683 | -$5,365 |
Connecticut | Thomaston | 2012 | Power and Hand Pumps | $365,374 | -$32,884 | -$65,767 |
Connecticut | Thomaston | 2012 | Pressure, Temp, & Humidity Meas & Contrling Instru | $107,799 | -$9,702 | -$19,404 |
Connecticut | Thomaston | 2012 | Pulp and Paper Industries Machinery | $31,140 | -$2,803 | -$5,605 |
Connecticut | Thomaston | 2012 | Relays and Solenoids | $416,359 | -$37,472 | -$74,945 |
Connecticut | Thomaston | 2012 | Repair or Alteration of Miscellaneous Buildings | $5,487 | -$494 | -$988 |
Connecticut | Thomaston | 2012 | Repair or Alteration of Other Administrative Facilities and Service Buildings | $3,911 | -$352 | -$704 |
Connecticut | Thomaston | 2012 | Resistors | $44,896 | -$4,041 | -$8,081 |
Connecticut | Thomaston | 2012 | Semiconductor Devices & Assoc Hardware | $19,752 | -$1,778 | -$3,555 |
Connecticut | Thomaston | 2012 | Space Heating Equipment & Domestic Water Heaters | $7,392 | -$665 | -$1,331 |
Connecticut | Thomaston | 2012 | Switches | $1,120,996 | -$100,890 | -$201,779 |
Connecticut | Thomaston | 2012 | Torque Converters and Speed Changers | $162,469 | -$14,622 | -$29,244 |
Connecticut | Thomaston | 2012 | Trash/Garbage Collection Srvcs-Incl Port San SVCS | $3,319 | -$299 | -$597 |
Connecticut | Thomaston | 2012 | Valves, Nonpowered | $218,605 | -$19,674 | -$39,349 |
Connecticut | Thomaston | 2012 | Valves, Powered | $1,847,415 | -$166,267 | -$332,535 | TOTAL | $26,930,834 | -$2,423,776 | -$4,847,553 |
Data sources and more data available at www.governmentcontractswon.com, compiled from public data at www.fpds.gov
Created by the Center for Security Policy
Defense Breakdown Economic Impact Report Generator (v.2.8.0-PoP) November 6, 2013 18:28:24 www.forthecommondefense.org