Go to www.forthecommondefense.org/reports to view detailed reports on Ohio counties, cities, Congressional Districts, industries, small businesses and information on sources and methodology.
BACKGROUND ON THE DEFENSE BUDGET CUTS: 2013-2021
|
State | County | Contract Year | Product or Service | $ Amount | Reduction by 9.0% | Reduction by 18.0% |
Ohio | Summit | 2012 | ACFT Hydraulic, Vacuum & DE-Icing Sys Comp | $238,704 | -$21,483 | -$42,967 |
Ohio | Summit | 2012 | ACFT Maint & Repair Shop Specilized Equip | $17,817 | -$1,604 | -$3,207 |
Ohio | Summit | 2012 | Adhesives | $13,220 | -$1,190 | -$2,380 |
Ohio | Summit | 2012 | ADP Components | $72,299 | -$6,507 | -$13,014 |
Ohio | Summit | 2012 | ADP Input/Output and Storage Devices | $104,386 | -$9,395 | -$18,789 |
Ohio | Summit | 2012 | ADP Software | $156,115 | -$14,050 | -$28,101 |
Ohio | Summit | 2012 | ADP Support Equip | $152,402 | -$13,716 | -$27,432 |
Ohio | Summit | 2012 | ADP Telecommunications & Transmission Services | $171,032 | -$15,393 | -$30,786 |
Ohio | Summit | 2012 | ADPE System Configuration | $67,033 | -$6,033 | -$12,066 |
Ohio | Summit | 2012 | Aircraft AC, Heating, And Pressurizing Equipment | $508,481 | -$45,763 | -$91,527 |
Ohio | Summit | 2012 | Aircraft Ground Servicing Equipment | $38,415 | -$3,457 | -$6,915 |
Ohio | Summit | 2012 | Aircraft Landing Equipment | $4,291 | -$386 | -$772 |
Ohio | Summit | 2012 | Aircraft Landing Gear Components | $268,525 | -$24,167 | -$48,335 |
Ohio | Summit | 2012 | Aircraft Wheel and Brake Systems | $31,846,254 | -$2,866,163 | -$5,732,326 |
Ohio | Summit | 2012 | Amplifiers | $477,148 | -$42,943 | -$85,887 |
Ohio | Summit | 2012 | Antennas, Waveguides & Related Equipment | $319,236 | -$28,731 | -$57,462 |
Ohio | Summit | 2012 | Athletic and Sporting Equipment | $161,923 | -$14,573 | -$29,146 |
Ohio | Summit | 2012 | Bars and Rods, Iron & Steel | $3,612 | -$325 | -$650 |
Ohio | Summit | 2012 | Bars and Rods, Nonferrous Base Metal | $31,766 | -$2,859 | -$5,718 |
Ohio | Summit | 2012 | Bearings, Antifriction, Unmounted | $55,289 | -$4,976 | -$9,952 |
Ohio | Summit | 2012 | Bearings, Plain, Unmounted | $54,587 | -$4,913 | -$9,826 |
Ohio | Summit | 2012 | Belting, Drive Belts, Fan Belts & Accys | $3,881 | -$349 | -$699 |
Ohio | Summit | 2012 | Bolts | $13,262 | -$1,194 | -$2,387 |
Ohio | Summit | 2012 | Bottles and Jars | $419 | -$38 | -$75 |
Ohio | Summit | 2012 | Brooms, Brushes, Mops, And Sponges | $405 | -$36 | -$73 |
Ohio | Summit | 2012 | Cable, Cord, Wire Assemblies: Comm Equip | $62,371 | -$5,613 | -$11,227 |
Ohio | Summit | 2012 | Centrifugals, Separators, And Press and Vac Filt | $298,214 | -$26,839 | -$53,679 |
Ohio | Summit | 2012 | Cert & Accred for Prods & Servs Other Than Educ | $5,526 | -$497 | -$995 |
Ohio | Summit | 2012 | Coil, Flat, And Wire Springs | $49,984 | -$4,499 | -$8,997 |
Ohio | Summit | 2012 | Coils and Transformers | $3,406 | -$307 | -$613 |
Ohio | Summit | 2012 | Combination & Miscellaneous Instruments | $39,860 | -$3,587 | -$7,175 |
Ohio | Summit | 2012 | Commercial & Industrial Gas Cylinders | $57,344 | -$5,161 | -$10,322 |
Ohio | Summit | 2012 | Communications Security Equip and Comps | $14,400 | -$1,296 | -$2,592 |
Ohio | Summit | 2012 | Compressors and Vacuum Pumps | $82,238 | -$7,401 | -$14,803 |
Ohio | Summit | 2012 | Connectors, Electrical | $676 | -$61 | -$122 |
Ohio | Summit | 2012 | Custodial - Janitorial Services | $21,456 | -$1,931 | -$3,862 |
Ohio | Summit | 2012 | Diesel Engines and Components | $97,145 | -$8,743 | -$17,486 |
Ohio | Summit | 2012 | Earth Moving and Excavating Equipment | $103,500 | -$9,315 | -$18,630 |
Ohio | Summit | 2012 | Elec Insulators and Insulating Material | $5,751 | -$518 | -$1,035 |
Ohio | Summit | 2012 | Electrical & Elct Boards, Cards & Asscted Hrdwre | $137,165 | -$12,345 | -$24,690 |
Ohio | Summit | 2012 | Electrical & Elct Properties Meas & Tst Instrumnts | $5,000 | -$450 | -$900 |
Ohio | Summit | 2012 | Electrical Contact Brushes & Electrodes | $6,977 | -$628 | -$1,256 |
Ohio | Summit | 2012 | Electrical Control Equipment | $798,279 | -$71,845 | -$143,690 |
Ohio | Summit | 2012 | Electrical Hardware and Supplies | $53,464 | -$4,812 | -$9,624 |
Ohio | Summit | 2012 | Eng Air & Oil Fil, Strainers, & Cleaners, Nonacft | $32,734 | -$2,946 | -$5,892 |
Ohio | Summit | 2012 | Eng Air & Oil Filters, Cleaners, ACFT Prime Moving | $36,587 | -$3,293 | -$6,586 |
Ohio | Summit | 2012 | Engine Electrical Sys Comps, Aircraft Prime Moving | $27,103 | -$2,439 | -$4,879 |
Ohio | Summit | 2012 | Engine Electrical Sys Comps, Nonaircraft | $8,563 | -$771 | -$1,541 |
Ohio | Summit | 2012 | Engine Fuel Sys Components, Nonaircraft | $79,292 | -$7,136 | -$14,273 |
Ohio | Summit | 2012 | Engine Fuel System Components, Aircraft & Missile | $95,536 | -$8,598 | -$17,196 |
Ohio | Summit | 2012 | Equip & Mats Testing/Nonmetalic Fabricated Mats | $24,150 | -$2,174 | -$4,347 |
Ohio | Summit | 2012 | Evaluation & Screening | $16,582 | -$1,492 | -$2,985 |
Ohio | Summit | 2012 | Facilities Operations Support Services | $31,192 | -$2,807 | -$5,615 |
Ohio | Summit | 2012 | Fastening Devices | $31,902 | -$2,871 | -$5,742 |
Ohio | Summit | 2012 | Fiber Optic Cable Assemblies and Harnesses | $3,795 | -$342 | -$683 |
Ohio | Summit | 2012 | Fiber Optic Cables | $18,542 | -$1,669 | -$3,338 |
Ohio | Summit | 2012 | Filters and Networks | $52,050 | -$4,685 | -$9,369 |
Ohio | Summit | 2012 | Fittings and Specialties; Hose, Pipe, Tube | $821,382 | -$73,924 | -$147,849 |
Ohio | Summit | 2012 | Fuel Burning Equipment Units | $165,256 | -$14,873 | -$29,746 |
Ohio | Summit | 2012 | Gas Turbines and Jet Eng, Non ACFT; And Comps | $39,007 | -$3,511 | -$7,021 |
Ohio | Summit | 2012 | Gas Turbines and Jet Engines, ACFT & Comps | $10,975 | -$988 | -$1,976 |
Ohio | Summit | 2012 | Gears, Pulleys, Sprockets and Trans Chain | $60,136 | -$5,412 | -$10,824 |
Ohio | Summit | 2012 | Generators and Generator Sets, Electrical | $730,007 | -$65,701 | -$131,401 |
Ohio | Summit | 2012 | Guide MSL & Space Veh Explo UN, Fuel, Comp | $1,890,233 | -$170,121 | -$340,242 |
Ohio | Summit | 2012 | Guided Missile Components | $426,028 | -$38,343 | -$76,685 |
Ohio | Summit | 2012 | Guided Missile Maint, RPR, & Chkout Specilized Eq | $19,661 | -$1,769 | -$3,539 |
Ohio | Summit | 2012 | Guns, 75 MM Through 125 MM | $5,049 | -$454 | -$909 |
Ohio | Summit | 2012 | Hand Tools, Edged, Nonpowered | $81,182 | -$7,306 | -$14,613 |
Ohio | Summit | 2012 | Hand Tools, Power Driven | $5,242 | -$472 | -$944 |
Ohio | Summit | 2012 | Hardware, Weapon System | $13,781 | -$1,240 | -$2,481 |
Ohio | Summit | 2012 | Hazard-Detecting Instruments & Apparatus | $210,218 | -$18,920 | -$37,839 |
Ohio | Summit | 2012 | Headsets, Handsets, Microphones & Speakers | $30,946 | -$2,785 | -$5,570 |
Ohio | Summit | 2012 | Heat Exchangers and Steam Condensers | $5,164 | -$465 | -$930 |
Ohio | Summit | 2012 | Hose and Tubing, Flexible | $471,756 | -$42,458 | -$84,916 |
Ohio | Summit | 2012 | Laboratory Equipment & Supplies | $67,550 | -$6,080 | -$12,159 |
Ohio | Summit | 2012 | Landscaping/Groundskeeping Services | $9,027 | -$812 | -$1,625 |
Ohio | Summit | 2012 | Liq & Gas Flow, Liq LVL, & Mech Motion Meas Instru | $3,955 | -$356 | -$712 |
Ohio | Summit | 2012 | Liquid Propellants & Fuel, Petroleum Base | $64,710 | -$5,824 | -$11,648 |
Ohio | Summit | 2012 | Lodging - Hotel/Motel | $128,951 | -$11,606 | -$23,211 |
Ohio | Summit | 2012 | Lugs, Terminals, And Terminal Strips | $335,052 | -$30,155 | -$60,309 |
Ohio | Summit | 2012 | Maint & Repair of Eq/Communication Equipment | $6,352 | -$572 | -$1,143 |
Ohio | Summit | 2012 | Maint & Repair of Eq/Maintenance & Repair Shop Eq | $143,200 | -$12,888 | -$25,776 |
Ohio | Summit | 2012 | Maint & Repair of Eq/Measuring Tools | $2,711 | -$244 | -$488 |
Ohio | Summit | 2012 | Maint & Repair of Eq/Medical & Dental Equipment | $171,250 | -$15,413 | -$30,825 |
Ohio | Summit | 2012 | Maint & Repair of Eq/Ship & Marine Equipment | $1,332,219 | -$119,900 | -$239,799 |
Ohio | Summit | 2012 | Mat Handling Equip, Nonself-Propelled | $12,150 | -$1,094 | -$2,187 |
Ohio | Summit | 2012 | Medical & Surgical Instruments, Equip & Supplies | $83,567 | -$7,521 | -$15,042 |
Ohio | Summit | 2012 | Mini & Micro Computer Control Devices | $4,587 | -$413 | -$826 |
Ohio | Summit | 2012 | Misc Alarm, Signal and Security Detection Systems | $20,902 | -$1,881 | -$3,762 |
Ohio | Summit | 2012 | Misc Electrical & Electronic Components | $66,679 | -$6,001 | -$12,002 |
Ohio | Summit | 2012 | Misc Engine Accessories, Nonaircraft | $3,139 | -$283 | -$565 |
Ohio | Summit | 2012 | Miscellaneous Communication Equipment | $25,918 | -$2,333 | -$4,665 |
Ohio | Summit | 2012 | Miscellaneous Construction Materials | $48,560 | -$4,370 | -$8,741 |
Ohio | Summit | 2012 | Miscellaneous Hardware | $246,033 | -$22,143 | -$44,286 |
Ohio | Summit | 2012 | Miscellaneous Machine Tools | $8,659 | -$779 | -$1,559 |
Ohio | Summit | 2012 | Miscellaneous Office Machines | $28,090 | -$2,528 | -$5,056 |
Ohio | Summit | 2012 | Miscellaneous Power Transmission Equip | $15,949 | -$1,435 | -$2,871 |
Ohio | Summit | 2012 | Miscellaneous Vehicular Components | $205,210 | -$18,469 | -$36,938 |
Ohio | Summit | 2012 | Motor Veh Maint & Repr Shop Specilized Eq | $62,535 | -$5,628 | -$11,256 |
Ohio | Summit | 2012 | Motors, Electrical | $4,236 | -$381 | -$762 |
Ohio | Summit | 2012 | MSL Aircraft Accessories and Components | $450,710 | -$40,564 | -$81,128 |
Ohio | Summit | 2012 | Nails, Keys, And Pins | $63,841 | -$5,746 | -$11,491 |
Ohio | Summit | 2012 | Nuts and Washers | $28,434 | -$2,559 | -$5,118 |
Ohio | Summit | 2012 | Office Devices and Accessories | $14,595 | -$1,314 | -$2,627 |
Ohio | Summit | 2012 | Office Furniture | $13,817 | -$1,244 | -$2,487 |
Ohio | Summit | 2012 | Office Information System Equipment | $33,658 | -$3,029 | -$6,058 |
Ohio | Summit | 2012 | Operational Training Devices | $7,121,239 | -$640,912 | -$1,281,823 |
Ohio | Summit | 2012 | O-Ring | $96,372 | -$8,673 | -$17,347 |
Ohio | Summit | 2012 | Other Administrative & Service Buildings | $13,379 | -$1,204 | -$2,408 |
Ohio | Summit | 2012 | Other Environ SVCS, Studies, & Analytical Support | $46,885 | -$4,220 | -$8,439 |
Ohio | Summit | 2012 | Packing and Gasket Materials | $558,431 | -$50,259 | -$100,518 |
Ohio | Summit | 2012 | Paints, Dopes, Varnishes, & Related Product | $1,656 | -$149 | -$298 |
Ohio | Summit | 2012 | Physical Properties Testing Equipment | $182,289 | -$16,406 | -$32,812 |
Ohio | Summit | 2012 | Pipe and Tube | $7,839 | -$706 | -$1,411 |
Ohio | Summit | 2012 | Plastics Fabricated Materials | $14,475 | -$1,303 | -$2,606 |
Ohio | Summit | 2012 | Plate, Sheet, Strip, & Foil: Nonferrous Base Metal | $48,189 | -$4,337 | -$8,674 |
Ohio | Summit | 2012 | Plate, Sheet, Strip, Foil; Iron and Steel | $115,280 | -$10,375 | -$20,750 |
Ohio | Summit | 2012 | Power and Hand Pumps | $26,951 | -$2,426 | -$4,851 |
Ohio | Summit | 2012 | Preservative and Sealing Compounds | $14,727 | -$1,325 | -$2,651 |
Ohio | Summit | 2012 | Pressure, Temp, & Humidity Meas & Contrling Instru | $18,750 | -$1,688 | -$3,375 |
Ohio | Summit | 2012 | Printing, Duplicating & Bookbinding Equip | $7,259 | -$653 | -$1,307 |
Ohio | Summit | 2012 | Production Jigs, Fixtures and Templates | $25,100 | -$2,259 | -$4,518 |
Ohio | Summit | 2012 | Quality Control SVCS/Fuels-Lubricants-Oils | $6,550 | -$590 | -$1,179 |
Ohio | Summit | 2012 | Radar Equipment, Airborne | $113,455,160 | -$10,210,965 | -$20,421,930 |
Ohio | Summit | 2012 | Radio & TV Comm Equipment, Except Airborne | $10,440 | -$940 | -$1,879 |
Ohio | Summit | 2012 | RDTE/Aircraft-Eng/Manuf Develop | $4,291,814 | -$386,263 | -$772,527 |
Ohio | Summit | 2012 | RDTE/Electronics & Communication Eq-Basic Research | $209,857 | -$18,887 | -$37,774 |
Ohio | Summit | 2012 | RDTE/Manufacturing Technology-Basic Research | $24,967 | -$2,247 | -$4,494 |
Ohio | Summit | 2012 | RDTE/Manufacturing Technology-Eng/Manuf Devel | $450,000 | -$40,500 | -$81,000 |
Ohio | Summit | 2012 | RDTE/Other Defense-Adv Tech Dev | $785,870 | -$70,728 | -$141,457 |
Ohio | Summit | 2012 | RDTE/Other Defense-Applied Research | $108,638 | -$9,777 | -$19,555 |
Ohio | Summit | 2012 | RDTE/Other Defense-Basic Research | $25,000 | -$2,250 | -$4,500 |
Ohio | Summit | 2012 | RDTE/Services-Basic Research | $69,415 | -$6,247 | -$12,495 |
Ohio | Summit | 2012 | RDTE/Services-Eng/Manuf Develop | $71,730 | -$6,456 | -$12,911 |
Ohio | Summit | 2012 | Recreational and Gymnastic Equipment | $113,717 | -$10,235 | -$20,469 |
Ohio | Summit | 2012 | Refrigeration and Air Conditioning Comps | $21,822 | -$1,964 | -$3,928 |
Ohio | Summit | 2012 | Repair or Alteration of Office Buildings | $73,797 | -$6,642 | -$13,283 |
Ohio | Summit | 2012 | Rings, Shims, And Spacers | $107,780 | -$9,700 | -$19,400 |
Ohio | Summit | 2012 | Rubber & Plastic Working Machinery | $68,030 | -$6,123 | -$12,245 |
Ohio | Summit | 2012 | Safety and Rescue Equipment | $10,844 | -$976 | -$1,952 |
Ohio | Summit | 2012 | Scaffolding Equipment and Concrete Forms | $13,160 | -$1,184 | -$2,369 |
Ohio | Summit | 2012 | Semiconductor Devices & Assoc Hardware | $479,202 | -$43,128 | -$86,256 |
Ohio | Summit | 2012 | Structural Shapes, Iron and Steel | $18,566 | -$1,671 | -$3,342 |
Ohio | Summit | 2012 | Switches | $47,123 | -$4,241 | -$8,482 |
Ohio | Summit | 2012 | Time Measuring Instruments | $16,175 | -$1,456 | -$2,912 |
Ohio | Summit | 2012 | Tires & Tubes, Pneumatic, Except Aircraft | $10,957,897 | -$986,211 | -$1,972,422 |
Ohio | Summit | 2012 | Torpedo Explosive Components | $27,000,053 | -$2,430,005 | -$4,860,010 |
Ohio | Summit | 2012 | Torque Converters and Speed Changers | $839,328 | -$75,540 | -$151,079 |
Ohio | Summit | 2012 | Training Aids | $200,978 | -$18,088 | -$36,176 |
Ohio | Summit | 2012 | Valves, Nonpowered | $55,083 | -$4,957 | -$9,915 |
Ohio | Summit | 2012 | Valves, Powered | $12,736 | -$1,146 | -$2,292 |
Ohio | Summit | 2012 | Vehicular Brake, Steering, Axle Wheel Comp | $63,748,633 | -$5,737,377 | -$11,474,754 |
Ohio | Summit | 2012 | Vehicular Cab, Body, Frame Structural Comp | $5,268 | -$474 | -$948 |
Ohio | Summit | 2012 | Vehicular Furniture and Accessories | $307,584 | -$27,683 | -$55,365 |
Ohio | Summit | 2012 | Vehicular Power Transmission Components | $49,949 | -$4,495 | -$8,991 |
Ohio | Summit | 2012 | Winches, Hoists, Cranes, And Derricks | $272,222 | -$24,500 | -$49,000 |
Ohio | Summit | 2012 | Wire and Cable, Electrical | $30,799 | -$2,772 | -$5,544 | TOTAL | $278,032,563 | -$25,022,935 | -$50,045,866 |
Data sources and more data available at www.governmentcontractswon.com, compiled from public data at www.fpds.gov
Created by the Center for Security Policy
Defense Breakdown Economic Impact Report Generator (v.2.8.0-PoP) November 6, 2013 19:53:52 www.forthecommondefense.org